fix: align managed agent rules v1.1.6#13
Conversation
|
P1 corrections pushed at
Verification: 389 tests / 0 failures / 1662 expectations; typecheck, build, vendor-kit, diff check, staged gitleaks, and live dry-runs for linux-arm64, macos-arm64, and my-setup all pass. No apply/install/canary/rollout was performed. Task remains in progress for fresh independent review. |
|
Legacy snapshot P1 repaired at exact head
Verification: sanitized full |
|
P1 remediation is ready for fresh exact-head review at
|
|
P1 equivalence correction pushed at exact head
No merge, install, apply, canary, publish, or rollout performed. Fresh independent review remains pending. |
Summary
global-agent-rules-standardbyte-identical to the acceptedhasnaxyz/iapp-identitiessource at48168c549cc2945053a4498a9a2b11888419bc94while separating exact upstream-file SHA-256 (b8e89cdb49e207e5b497ac51384d67022b94fe5645cc9273db60384eb2c2fb32) from selected policy-payload SHA-256 (8b236086b82e94490516e0b00dffa03fb5f6841b68d95f80fc3e3c8fb7087420)station01matcheslinux-arm64without dropping custom selectors or variablessession restore <snapshot>command forhasna.configs.session-render-snapshot/v1linux-arm64,macos-arm64, andmy-setupStack and scope
This PR remains intentionally stacked on PR #12 branch
feat/managed-project-context-rendererat exact committed head550a0ff794a9602f6448ac9b7fe6c5c16b017a82. All P1 work stayed in the existing task worktree, branch, task, and PR.Source and tests changed only. No generated
CODEWITH.md, provider render, profile apply, package install, canary, deployment, or fleet rollout was performed. The existing Todos task remainsin_progresspending independent review and later controlled rollout work.Verification
bun run typecheck: passbun run build: passbun run kit:check: passgit diff --check: passgitleaks git --staged --redact: cleanlinux-arm64,macos-arm64, andmy-setupeach exit 0AUTHORIZATION,GUIDE_TEMPLATE,PRIMARYAPIKEY,USAGE_DATA,WINDOW_DAYS) and performs no writesmcp, model, and manual instruction settingsLive-state boundary
This PR repairs and proves the candidate paths only. It does not claim that persisted cloud profile selectors, live generated provider files, manifests, or installed package state are already reconciled. That remains a separately controlled apply/install/canary/rollout phase.
Rollback
Before merge, close this PR or delete its branch. After merge but before rollout, revert
8b5ff4e292972c1bf53cec7f6b74064d2e5ea5bcfor the P1 follow-up and6b19e1bd37ed945cbb31cfb2d807368c217f38fefor the policy-source commit if a full rollback is required. After any future managed apply, use the recorded snapshot path andinstructions session restore <snapshot> --dry-runbefore restoration; restore refuses drifted applied files.Independent review
Prior exact-head reviews passed for
6b19e1bd37ed945cbb31cfb2d807368c217f38fe. A fresh independent adversarial review of current head8b5ff4e292972c1bf53cec7f6b74064d2e5ea5bcis pending and must be reconciled before this task is considered complete.